← CFD Tools

ADVISOR / 011

Wall Treatment & y+ Advisor

Choose a sensible near-wall starting strategy from the engineering objective, available wall treatment and mesh budget. This is a structured decision aid—not a replacement for solver documentation.

y+RANSWall functionsMeshing
INPUTS

Near-wall requirements

WORKFLOW

Choose wall modelling before choosing first-cell height.

The correct order is modelling strategy → target y+ → first-cell estimate → prism stack → solved y+ verification. Picking an arbitrary y+ target first can produce an internally inconsistent mesh/model combination.

AI Assistance
Contact
TGTelegram